COST ESTIMATING / SCHEDULING

A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values. A problem with a cost overrun can be avoided with a credible, reliable, and accurate cost estimate. An estimator is the professional who prepares cost estimates. There are different types of estimators, whose title may be preceded by a modifier, such as building estimator, or electrical estimator, or chief estimator. Other professional titles may also prepare estimates or contribute to estimates, such as quantity surveyors, cost engineers, etc. In the US, there were 185,400 cost estimators in 2010.[1] There are around 75,000 professional quantity surveyors working in the UK.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>